Availability: | |
---|---|
YR-5TT28D
1) Types: Normal and hot
2)Electronic cooling: electrical
3) Hot temperature: 85 - 95 degrees centigrade
4) Cold temperature: 4 - 15 degrees centigrade
5) Rated hot power: 550W
6) Rate cold power: 70W
7) Rated voltage: 220V
8) Rated frequency: 50 - 60Hz
9) Cools and filters up to 70oz/2L per hour
10) Reduce chlorine, taste & odor
11) Compact design for use in kitchen, bedroom, bathroom, office
12) Multi-Beverage-use with your favorite beverage
13) Pour directly into tank, or straight from the bottle with our exclusive adapter included
14) Comes with a full set of handy adapters. Adaptors suit most 1/4-11/2 gallon or 1-5L bottles
15) Use adapters with all your favorite beverages
Function | Cold and Normal water,hot and normal water |
Cold power | 75W/550w |
Water temperature | below15 degrees |
Related Voltage/ Frequence | 220V/110V~50/60hz |
Color | white |
LOGO& Package | OEM |
Packing(mm)L*W*H | 278x278x498mm |
20ft container | 750pcs |
40HQ container | 1680pcs |
Body material | Brand new ABS,AS,PP |
Wash and rinse out the plastic water tanks thoroughly before use.
Remove the filter from its packaging then fully cover and soak the filter in cold clean water for 30 minutes.
Place Lower water tank and Upper water tank onto the chiller.
Insert filter and ensure it sits flat and fully seated.
Fill Upper water tank with clean cold water.
As a reminder of when to change and replace the filter,lift and turn the dial on the lid to the current month.The Filter Replacement month will show the second successive month from the start date.
Place the lid on the Upper water tank.
Let the water flow through the filter into the lower water tank and continue to refill the top water tank until both the top and lower water tanks are full.
Insert the plug into a power socket and switch on.
Switch the Water Chiller to “ON” at the back of the unit.
For best performance, and depending on the water temperature,allow approximately 30-40 minutes for the water to chill before use.
Pre-Sales Service
* Inquiry and consulting support.
* Sample testing support.
* View our Factory.
After-Sales Service
* Training how to instal the machine, training how to use the machine.
* Engineers available to service machinery overseas.
1) Types: Normal and hot
2)Electronic cooling: electrical
3) Hot temperature: 85 - 95 degrees centigrade
4) Cold temperature: 4 - 15 degrees centigrade
5) Rated hot power: 550W
6) Rate cold power: 70W
7) Rated voltage: 220V
8) Rated frequency: 50 - 60Hz
9) Cools and filters up to 70oz/2L per hour
10) Reduce chlorine, taste & odor
11) Compact design for use in kitchen, bedroom, bathroom, office
12) Multi-Beverage-use with your favorite beverage
13) Pour directly into tank, or straight from the bottle with our exclusive adapter included
14) Comes with a full set of handy adapters. Adaptors suit most 1/4-11/2 gallon or 1-5L bottles
15) Use adapters with all your favorite beverages
Function | Cold and Normal water,hot and normal water |
Cold power | 75W/550w |
Water temperature | below15 degrees |
Related Voltage/ Frequence | 220V/110V~50/60hz |
Color | white |
LOGO& Package | OEM |
Packing(mm)L*W*H | 278x278x498mm |
20ft container | 750pcs |
40HQ container | 1680pcs |
Body material | Brand new ABS,AS,PP |
Wash and rinse out the plastic water tanks thoroughly before use.
Remove the filter from its packaging then fully cover and soak the filter in cold clean water for 30 minutes.
Place Lower water tank and Upper water tank onto the chiller.
Insert filter and ensure it sits flat and fully seated.
Fill Upper water tank with clean cold water.
As a reminder of when to change and replace the filter,lift and turn the dial on the lid to the current month.The Filter Replacement month will show the second successive month from the start date.
Place the lid on the Upper water tank.
Let the water flow through the filter into the lower water tank and continue to refill the top water tank until both the top and lower water tanks are full.
Insert the plug into a power socket and switch on.
Switch the Water Chiller to “ON” at the back of the unit.
For best performance, and depending on the water temperature,allow approximately 30-40 minutes for the water to chill before use.
Pre-Sales Service
* Inquiry and consulting support.
* Sample testing support.
* View our Factory.
After-Sales Service
* Training how to instal the machine, training how to use the machine.
* Engineers available to service machinery overseas.